William G. (Bill) Bridges is President of the Process Improvement Institute (PII). He has over 40 years of experience, including more than 30 in senior management and senior PSM advisory roles. Bill is considered one of the leading authorities on process safety engineering, risk management, and human error prevention.

PHA of Non-Routine Modes of Operation

Per OSHA and per CCPS, a PHA is the risk analysis for the unit for all modes of operation. CSB has been really hitting hard lately as well. (See the Bayer CropSciences report for a good example.) The most critical part of that analysis is the portion for startup, shutdown, and online maintenance, since 80% [...]

By |2016-12-07T01:33:33-07:00August 1st, 2014|CCPS, CSB, OSHA, PHA|Comments Off on PHA of Non-Routine Modes of Operation

Determining SIF and SIL during PHA/HAZOP

Our data differs. We have performed more than 11,000 unit-sized PHA/HAZOPs over the past 24 years; 1,000 of these have been new designs (projects, as you have focused on); the rest have been re-do of existing plant PHAs (because the project PHA/HAZOPs were so deficient). If you have a good engineering team then the team [...]

By |2016-12-07T01:33:33-07:00July 28th, 2014|HAZOP, PHA, SIF, SIL|Comments Off on Determining SIF and SIL during PHA/HAZOP

More on the Use of Risk Matrices in PHAs/HAZOPs

Our data on 11,000+ unit sized hazard reviews to date (using HAZOP, What-if, and variations) show that using a risk matrix detracts from brainstorming and does not improve the risk judgment of a multiple discipline team of process and operations with good to excellent expertise. If you don't have such a team, then you will [...]

By |2016-12-07T01:33:33-07:00July 14th, 2014|HAZOP, PHA|Comments Off on More on the Use of Risk Matrices in PHAs/HAZOPs

Can a final element, such as an air-to-open control valve, be shared between a BPCS control loop that is the cause of a scenario, and an SIF that is an IPL for the same scenario?

If you used LOPA to determine if you need a SIF and to identify what SIL is required (if any), then you cannot share or partially share a final element.  So, if the BPCS control loop is the cause (initiating event) and that loop uses the final element in question, then that same final element [...]

By |2022-05-01T22:26:55-07:00January 29th, 2014|Uncategorized|Comments Off on Can a final element, such as an air-to-open control valve, be shared between a BPCS control loop that is the cause of a scenario, and an SIF that is an IPL for the same scenario?

When to Use a Risk Matrix and Risk Tolerable Criteria

We don't recommend using a risk matrix during PHAs/HAZOPs. matrices are good tools to teach risk concepts, but in a well led PHA/HAZOP they reduce quality more than they increase quality. To see much more details, download and read this free paper: http://www.process-improvement-institute.com/wp-content/uploads/2026/04/Optimizing-PHA-HAZOP-while-maximizing-brainstorming-2024-R5-with-award-image.pdf We use a risk matrix and a risk tolerance criteria only when [...]